AUTOMATION / RETROFIT: Rebuilding a Jestädt-machining center
to increase the turnout and to enhance the technical disposability.





- Increasing the output
- Enhancing the technical availability
REALIZATION:
- Modifying the three cycle time determining stations with new engines and controls
- Increasing the ouput from 13 to 18,5 parts per minute
- Fashioning the cutting point betweeen SIMATIC S5 and S7 turned out as challenging (but got finally solved successfully)